Right Way Plumbing, Heating, Air Conditioning, Inc. CALL TODAY! 360.855.2665
647-A Sunset Park Drive
Sedro-Woolley, WA 98284

Right Way Solar, Wind, Geothermal
Home Plumbing Heating & Cooling Alternative Energy Hearth Products Projects About Us Contact Us
Projects Done the Right Way
Puget Sound Kidney Center
1005 Pacific Ave.
Everett WA 98201

Clinic design by:
Botesch Nash and Hall Architects

General Contractor:
Newland Construction

Right Way Plumbing an Heating installed the plumbing and reverse osmosis for the addition of 12 new dialysis stations. Reverse osmosis, also known as hyperfiltration, is the finest filtration known. Water plays an important, life sustaining role for dialysis patients. And as such, the water used for this critical function must be of special quality. Dialysis stations also include oxygen lines, vacuum suction, medical gas lines, and drains for hot and cold water.

Members of
Sedro-Woolley Chamber of Commerce SICBA Built Green BIAW NAHB Sustainable Connections